
2013
- Categories:History
- Author:
- Origin:
- Time of issue:2019-10-29 16:16
- Views:
(Summary description) Invested RMB 1.23 billion to build a high-conductive green cable project production base in the plain area.
2013
(Summary description) Invested RMB 1.23 billion to build a high-conductive green cable project production base in the plain area.
- Categories:History
- Author:
- Origin:
- Time of issue:2019-10-29 16:16
- Views:
Information
Invested RMB 1.23 billion to build a high-conductive green cable project production base in the plain area.
Scan the QR code to read on your phone
CONTACT
E-mail:jscable@cnjscable.com
INQUIRY
Customer message
描述:
Copyright © Zhengzhou Jinhang High-tech Co., Ltd. All Rights Reserved 豫ICP备18001996号 Powered by www.300.cn